Skip to main content

Critical Path, Surreal Numbers

Loading my e-reader for some travels ahead!

One of those books on my want-to-read list, Critical Path by Richard Buckminster Fuller
And another one I should be reading is Surreal Numbers by Donald E. Knuth

Comments

Popular posts from this blog

ADR modules part 1

This is a restoration project I’ve been procrastinating around since about 2015. This will be quite some work, but then if one doesn’t start at least it will not happen at all. This will be a step by step project, and see how far we get with this Kaizen like approach. So first a short intro of the four audio modules made by Audio & Design (Recording) Ltd, in the mid 70s based in Shinfield Green, Reading, Berkshire UK. The company still exists to this date and is still active in pro-audio and is now in a different location but still in Reading. These modules can be dated to the mid 1970s, more precisely found the E900 Equaliser unit quality checklists to be dated 12 November 1976. There are two E900 equaliser modules, and two F760N Compressor/Limiters. A picture of the now dismantled mixing desk with the four modules. The mixing desk was in a quite dusty and sorry state. The desk was too space consuming and heavy to keep and many other parts were sold as separate items. ...

ADR modules part 2, to recap or not?

Electrolytic capacitors have a wet dielectric which degrades with age and temperature. As a result the extremely thin oxide layers may become less isolating when stored over decades. Either the capacitor shorts or opens at some point, or just doesn't perform as good when it was new. Re-capping is the usual procedure to replace (all) electrolytic caps in restoring old audio equipment. The most common coupling capacitor value in these modules is 15uF / 40V. These smaller values might be replaceable with solid foil capacitors, though it largely depends on the space on the circuit board if this is possible and the cost involved. High-end audio nut cases (no relation to this blog) may spend top dollar/euro/yen on such things. Here it just has to be in line with the actual value of these units. So we will only use foil if the costs are limited. Otherwise just stick to cheap but good quality electrolytic caps. The likes of Nichicon, Panasonic, Vishay. Vishay bought a lot of the old Eur...

Apocalyptic Treasures

We live in Apocalyptic times, where we are facing large challenges for the future. Some counter the problems of our wasteful society e.g. by restoring some great finds from the local scrap yards and posting very well narrated repair videos about those finds on YouTube. (Cheers to TPAI! ;)) Some react and cry where to find such gems, but the point is: those are usually right under your nose! What I usually find on my bicycle ride work are empty half liter PET bottles or empty energy drink cans of a certain unnamed Austrian brand sponsoring a Formula 1 team with a Dutch rookie driver (or half empty cans of similar undrinkable liquids). Occasionally, there is the odd tossed-out-of-car-window CD-R with some downloaded whatever music. I tend to archive those in the correct litter bin, and surely not bother to try and play them. However, last week there was clearly a real music CD shining between the roadside grass, in a very nice state. On closer inspection this seemed to be a BBC music ...